NHS Case Study – 260-Site Mobilisation

Overview

Craftex was engaged to deliver a nationwide mobilisation across 260 NHS sites, providing essential equipment, training, and end-of-life machinery demobilisation within extremely tight timeframes. This project required meticulous planning, around-the-clock coordination, and seamless operational execution.

A modern wooden house sits on a grassy hillside with tall grasses in the foreground. Behind the house, there is a large body of water with mountains in the background under a sky with soft, pastel colors.
Scenic landscape of a large turquoise lake surrounded by rolling green hills, with rugged mountain peaks in the background under a cloudy sky.

Project Scope & Achievements

✔ Rapid Deployment of Equipment

  • Delivered 1,639 pieces of equipment across the UK.

  • All deliveries completed On-Time-in-Full within 48 hours, ensuring critical NHS facilities received the tools they needed without delay.

✔ Comprehensive Operator Training

  • 54 key NHS sites received on-site operator training within 72 hours, scheduled between 04:30 and 08:30 to minimise disruption to clinical operations.

  • A full training rollout programme was implemented across all remaining sites within 4 weeks, ensuring consistent national standards of use and safety.

✔ Day-1 Support Packs

  • Each delivery included a Day 1 Pack containing video tutorials, user manuals, and quick-start guidance to support immediate equipment adoption.

✔ End-of-Life Machinery Demobilisation

  • A structured demobilisation plan was executed to safely remove incumbent equipment and streamline the transition to new assets.

Outcome

This mobilisation represented one of the most logistically complex deployments within the NHS estate. Craftex delivered a turnkey solution—equipment, training, and demobilisation—providing complete peace of mind to the client.

Modern wooden house with large glass window, set against a mountainous landscape with dry grass and sparse trees.
Smiling woman with curly hair, glasses, and jewelry, sitting indoors.

Quote Source

“This was a very complex mobilisation and the only thing I didn’t have to worry about was the equipment. Thank you!”

Case Studies

  • Modern hotel lobby with large windows, marble floors, seating area with gray, black, and red chairs, tall concrete columns, and city view outside.

    CleanZero – Rolls-Royce

    Global brand at the pinnacle of luxury, innovation & engineering adopts Clean Zero for its Aerospace Division

  • View of a historic Gothic-style cathedral with two tall spires, a large arched window, and intricate stone detailing, overlooking a well-maintained green lawn and surrounded by a crowd of people.

    Equipment – Cambridge University

    Mobilisation of one of the world’s oldest and most prestigious universities with complex delivery and training requirements

  • Empty gym with weightlifting equipment, benches, and a small artificial turf area for fitness activities.

    Chemical – PureGym

    Sanitisation solution driving up consumer confidence for the UK’s market leader in low-cost gyms