CRAFTEX

Case Studies

Explore how our smart Clean 360 strategy meets real-world results.

Our case studies highlight winning solutions that solved tough challenges, delivered measurable impact, and helped clients unlock new opportunities.

  • Exterior view of Finchley Memorial Hospital with glass windows and a sign on the building.

    Equipment – NHS CHP

    Large-scale mobilisation delivered on time and in full within a 6-week lead time from manufacturing to contract go-live.

  • Large jet engine components being assembled or maintained inside an industrial aerospace manufacturing facility, with yellow support structures, machinery, and safety cones visible.

    CleanZero – Rolls-Royce

    Global brand at the pinnacle of luxury, innovation & engineering adopts Clean Zero for its Aerospace Division.

  • A large Gothic cathedral with twin towers, surrounded by green lawns and historic buildings, with a crowd of people walking on the street in front.

    Equipment – Cambridge University

    Mobilisation of one of the world’s oldest and most prestigious universities with complex delivery and training requirements.

  • Indoor gym with various workout equipment, including benches, weights, and a pull-up station, with a motivational sign on the wall that says 'IMPRESS YOURSELF'.

    Chemical – PureGym

    Sanitisation solution driving up consumer confidence for the UK’s market leader in low-cost gyms.